What a Roof Replacement Week Actually Looks Like

From contract to final inspection: what happens each day, what you need to do to prepare, and how long the whole thing really takes.

By Taylor Smith · · 6 min read

Dumpster filled with torn-off shingles during a roof replacement

Most residential roofs here are a one- to two-day install. The full process runs one to three weeks.

Before the crew arrives

Contract and scope signed, permit pulled, materials delivered a day ahead. Delivery day is the loudest surprise for most homeowners — a loaded boom truck sets bundles directly on the slopes.

Prepare the house

  • Move vehicles out of the driveway and away from the eaves.
  • Take pictures off walls; tear-off vibration knocks frames crooked.
  • Cover items in the garage and attic — debris falls through the deck.
  • Plan for the dog. It is loud all day.

Day one: tear-off and dry-in

Old material comes off down to the deck. Rotten sheathing is replaced and billed at the per-sheet rate in your contract. Underlayment, ice-and-water at valleys and penetrations, and drip edge go on the same day — the house is never left open overnight.

Day two: install and detail

Starter course, field shingles, flashing, vents, ridge caps. The details take as long as the field.

Cleanup and final walk

Magnet sweep of the yard and drive, gutters cleared of nails and granules. Walk the property with the foreman before final payment and note anything you want addressed.

Then paperwork

Final invoice, warranty registration, and — on an insurance job — the completion documents that release your recoverable depreciation.

Roofing help related to this article

Every article here connects back to work our crews do across the Texas Panhandle and Eastern New Mexico.

Need this in your town? Amarillo, TX · Lubbock, TX · Clovis, NM · Canyon, TX

Keep reading

Need a trusted roofer in Texas or New Mexico?

Schedule your free roof inspection today. Honest assessment, written estimate, no pressure.